Product Detail :
|
C-4t composite contract package in connection with new bg railway line of horc project fort 1 design & construction of twin tunnel using nat m and cut & cover method from km 24.880 to km 29, 580; 1 design & installation of ballastless track (excluding supply of rails) from km 24.856 to km 29.680; 1 detailed design. supply, installation, testing & commissioning of general electrical services including supply, erection, testing and commissioning of 11kv ht/lt power and control cable network, gis substation (11/0.433} kva, tunnel lighting system, etc. from km 24.880 to km 29.680; 1 design & construction of embankment, bridges and other miscellaneous works.
|